The finished hanging the last of the drywall today (had some issues in the bay window area, that led to some window frame work being done before they could finish), the seams are being taped, and the screw holes are being filled with mud. The hot guy (I've named them- there are: the hot guy, the head guy, sir talks a lot, the flirt, blue eyes, & the cute one) is removing all the scraps of drywall, sweeping, & vacuuming right now. The head guy is doing the seams with the aid of the flirt. The cute one is mudding the screw holes. Sir talks a lot is home sick today (which is sad, because he's halarious). Blue eyes is off today.
The plan is to have the walls & ceiling done and primed by Friday and the trim will go up next week, unless the local mill finishes it faster than predicted. As soon as the trim is done, the electrician will return and install my gorgeous light fixtures and wire all my outlets, and install the new breaker for the suite in the box.
We'll be finishing up the floors soon, and then I will be painting the room! Then we'll do the crown molding ourselves & trim out the "fabric" panels on the walls!
EEEK!!!!
In about 2 weeks or so (give or take), we'll be sleeping in our own room again!!!
Re: My bedroom is progressing!
Haha - love the nick names and Yay for having your room back soon!
ps. sending you a package this week. Better late than never, right?